Atlas of One

· JPMorgan · Other

J.P. Morgan Asian Foundries: TSMC Shutting Down Mature 12-Inch Process Node Capacity?

Summaries are public. PDF access requires an active membership; all members have the same access. Sign in

J.P. Morgan addresses market speculation regarding TSMC's potential closure of mature 12-inch capacity. TSMC plans to convert 40-90nm capacity at its Fab 14 and Fab 12 facilities into advanced packaging space for CoWoS. This initial phase involves 20-30k wafer starts per month, representing less than 10% of total capacity at this node, with implementation expected by late 2027.

A larger closure plan, potentially impacting up to 20% of 40-90nm capacity, remains under discussion with clients. A final decision is anticipated around April or May 2026. TSMC cites three strategic reasons: structural oversupply from Chinese capacity build-out, eventual demand migration to 28/22nm nodes, and sub-70% utilization rates over the past three years.

J.P. Morgan believes the impact on alternative foundries like UMC and GlobalFoundries will be primarily sentimental rather than a substantial driver of order shifts or pricing power. Industry-wide utilization remains low outside of 28nm.

Chinese foundries such as SMIC and Hua Hong have recently raised prices by 5-10% driven by localization demand, though sustainability remains questionable amid weak smartphone momentum. Meanwhile, UMC's Xiamen facility faces potential stranded asset risk due to shifting geopolitical supply chain dynamics.

Find related research →